New 6-Deck Jet Dryer

Boise Cascade | Havana, FL

From Rebuild to New Build: Westmill Delivers 4-Deck Jet Dryer

In early 2020, Westmill Industries completed the successful delivery of a new 4-deck jet dryer at what was then Coastal Plywood’s facility in Havana, Florida. Originally intended as a rebuild project for two aging dryers, this initiative evolved into a full new-build project as discussions progressed — a testament to the value of long-term planning and future-focused investment in dryer technology.

Project Overview

The first of the two new dryers, Dryer #2, was completed in early 2020 and features:

  • 20 hot sections for high-volume throughput
  • 3 cooling sections for enhanced conditioning
  • Westmill’s proven jet dryer design for consistent, energy-efficient performance

This was a full design, engineering, and materials supply package provided by Westmill — tailored to meet the mill’s specific operational requirements.

A New Chapter with Boise Cascade

In June 2022, Boise Cascade Wood Products acquired Coastal Plywood, becoming the new owners of this advanced dryer system. With this acquisition, Boise Cascade inherited not only a high-capacity, state-of-the-art dryer, but also Westmill’s ongoing commitment to long-term performance, service, and support.


Innovation Backed by Experience

This project illustrates how Westmill works closely with clients to reassess goals and evolve project scopes as needed — ensuring the best long-term value and performance. Whether it’s a rebuild or a new build, we bring the same level of detail, engineering precision, and customer partnership to every job.